Project Development

Site/Land Due Diligence and Feasibility

As an electromechanical origin company, we provide services for investors in logistics centres, data centres, pharmaceutical production facilities and industrial facilities by considering all the advantages, disadvantages, risks and total cost of ownership of alternative plots according to the investment requirements during the land selection process.

  • The Land/Site Assessment 
  • Cadastral Survey
  • Environmental Assessment and Threats
  • Seismic, Geological and Geotechnical Assessment
  • Infrastructure Evaluation
  • Building Tests to Fit Studies

Design

Our multi-disciplined design team take a holistic approach to logistic centre, data centre, pharmaceutical production facilities and industrial facilities design and design management. 

We and our partners are dedicated to providing professional design services that fulfil our clients’ needs, adhere to our client’s budget and schedule parameters and provide applicable solutions that create functional spaces within enriched aesthetic environments.

Construction

Site/Land Due Diligence and Feasibility

Markas can offer all architectural, structural, electrical, mechanical and plumbing services in one trade works package.

We provide fast, high quality and economical solutions with the experience and expert staff of MARKAS in design, purchasing, implementation and operation processes.

Project Management

1. Design Management

  • Design Program Management
  • Design Approval Management
  • Design Meetings
  • Change Management
  • Peer Review

3. Quality Management

  • Project Quality Report
  • Material & Implementation Control

5. Budget and Cost Control

  • Progress Payment Management
  • Value Engineering

7. Contract Management

  • Scope Management
  • Program Management
  • Change Management

2. Site Management and Audit

  • Health and Safety 
  • Site Progress Report
  • Test and Commissioning
  • Temporary and Permanent Acceptance 

4. Tender Management

  • Technical Specification and RFP Preparation
  • Supplier and Price Comparison Report
  • Negotiation Management
  • Score Card 

6. Procurement Management

  • Order Management
  • Supplier Contract Management
  • Delivery Management
  • Installation Program Management

Building Information Modelling (BIM)

MARKAS provide BIM model that meets the BS EN ISO 19650 standard requirements which is an international standard for managing information over the whole life cycle of a built asset using building information modelling (BIM). The aim of using BIM is to align stakeholder expectations, reduce risk to overall cost and schedule due to rework and enhance overall customer experience and satisfaction.

A BIM Execution Plan (BEP), also prepared by MARKAS, is a comprehensive document that helps project participants move forward with clear roles and expectations for each project. 

The benefits and targeted gains to be obtained by the investors in the works carried out with this modelling method and standards are summarized below.

  • Better design understanding (3D visual management) / less uncertainty
  • Prevent design faults
  • Reducing the time spent with coordination and design problems in the implemantation stage
  • Choosing the right material, supplying it and ensuring that the right productions are made
  • Ensuring a healthier and faster extraction of quantities
  • Preventing loss of information in the transition between processes (Design, Construction, Operation)
  • Processes become faster, more efficient and understandable
  • Greater efficiency and shorter project lifecycles
  • Improved communications and coordination between disciplines
  • Better cost control
  • Reduced scraps and wastes
  • Improve onsite collaboration and communication
  • Higher building quality result
  • %30 Reduction of the construction cost
  • %61 Reduction of errors caused by document, information loss and omissions
  • %36 Reduction of errors and rework 
  • %33 Reduction of life cycle cost of building
  • %50 Low emission
  • %22 Reducing overall project duration
  • Reduction of %17 end-of-work price difference and quantity variance increases